Roof repair
Not ready to replace? Leaks, flashing and storm-lifted shingles fixed properly.
Roof replacement · Tampa Bay
A full tear-off and a new roof, permitted, inspected and fastened for Florida wind. Shingle, standing-seam metal, tile or flat, with a fixed written price before anything starts.
When it is time
A good roofer should talk you out of a replacement you do not need. When we recommend one, the photo report shows why, slope by slope. These are the signs that usually tip the decision.
Step by step
The same sequence on every roof, written into your scope so nothing depends on who shows up that morning.
We apply for the permit with your city or county and order materials in the color you chose.
Tarps over shrubs and pool areas, plywood against walls where debris falls, and a dumpster placed where you agree.
Old roofing comes off to the deck. We re-nail the decking and replace damaged sheets at the listed price.
Secondary water barrier and underlayment as current code requires, so a lost shingle does not mean a wet ceiling.
New drip edge, wall and valley flashing, pipe boots and vents. We do not reuse old flashing on a new roof.
Shingles, panels or tiles fastened to the pattern the code and the manufacturer specify for wind.
Gutters cleared, magnetic sweeps of the yard and driveway, and the dumpster gone within a day or two.
Final inspection booked, permit closed, warranty registered and your full photo record emailed to you.
Materials
General guidance for Tampa Bay homes. Your inspection report adds what matters for your house: pitch, structure, HOA rules and budget.
| Material | Best for | Typical life | Good to know |
|---|---|---|---|
| Architectural shingle | Most pitched roofs, best value | 15–25 years | Wide color choice; wind rating depends on correct nailing |
| Standing-seam metal | Long-term owners, coastal homes | 40+ years | Higher cost; concealed fasteners; light colors reflect heat |
| Concrete tile | Mediterranean and Spanish styles | Tiles last decades | Heavy; underlayment typically needs renewing at 20–30 years |
| Clay tile | Historic and high-end homes | Tiles last decades | Matching older tiles takes time; we source from salvage when we can |
| Modified bitumen or single-ply | Flat and low-slope sections | 12–20 years | Drainage and seams matter more than the brand |

Price and payment
Your quote lists the roof system, every accessory and the per-sheet price for decking, so the number you sign is the number you pay unless we find rot, and then you see the photos first.
A deposit confirms your materials order; the balance is due after the final inspection passes. If insurance is paying part of the cost, we work from your adjuster’s scope and explain any difference in writing.
Get a written quoteQuestions
Every quote comes with a written scope, so you can compare it line by line with anyone else’s.
Most single-family shingle roofs take one to three working days on site. Standing-seam metal and tile take longer, often a week or more. Permits and material delivery usually add one to three weeks before the crew arrives.
We tear every replacement off to the deck. That is the only way to inspect and re-nail the decking, replace rotten sheets and install the underlayment and secondary water barrier that current Florida code expects.
Your written price lists a per-sheet cost for decking replacement before work starts. We photograph every sheet we replace, so you see exactly what was found and what it cost.
Not ready to replace? Leaks, flashing and storm-lifted shingles fixed properly.
Tarping, dated photos for your insurer and the permanent fix.
Before-and-after sliders from illustrated sample re-roofs.
Book an inspection and add photos of the problem.
Tell us about the roof, add a few photos if you have them, and pick a time that suits you. We reply within one business day.